Free browser-based calculator

Parking Lot Resurfacing & Removal Calculator

Estimate milling, base repairs, overlay or reconstruction, pavement removal, markings and project contingency.

Project inputs

Change the assumptions to explore an early planning scenario.

Planning result

Enter your assumptions

  • Removal or milling
  • Patches and new surface
  • Drainage and markings
  • Estimated rehabilitation budget

How to use this result

Adjust the full-depth repair percentage after a pavement assessment. Resurfacing budgets are highly sensitive to hidden base failure and elevation corrections.

Treatment level

Overlay, milling and full reconstruction apply different removal allowances.

Repair allowance

The patch percentage creates a visible reserve for localized base and pavement replacement.

Important: Do not select an overlay solely from surface appearance. Structural failure, drainage and accessible slopes require site-specific assessment.